Manufacturing / Distribution
|
Rainier Pallet Development - Located in Auburn, Washington, this wood pallet manufacturing facility consisted of a 11,000 SF tilt-up building, a 1,900 SF office build out and a 1,200 SF outside storage canopy.
|
|||||||
|
Rainier View Industrial Park - This 80,000+ SF office park is located in Auburn, Washington and consists of 3 tilt up concrete warehouse buildings. For a more detailed description of each of the 3 buildings, please click here.
|
|||||||
|
Roadway Express - A 7,350 SF addition was completed while the trucking facility remained in full operation. Critical elements included tying onto an existing pre-engineered structure, addition of new truck/trailer aprons and a new fire sprinkler system throughout.
|
|||||||
|
Wellington Hills Business Campus - Currently consists of 2 buildings, Building A and Building B in Woodinville, Washington. Building A was designed and built for Primus Manufacturing and includes a total of 102,874 SF of manufacturing and office space. Building B was desigend and built to include 92,264 SF of manufacturing and office space with an addtional 18,700 SF concrete mezzanine.
|
|||||||
|
Woodtone - A 40,000 SF wood processing facility located in Everett, Washington on a 6.8 acre site. The main building houses the office, showroom, and processing racks. There are also 2 additional dry storage sheds on site.
|


