Manufacturing / Distribution

Rainier Pallet Development - Located in Auburn, Washington, this wood pallet manufacturing facility consisted of a

11,000 SF tilt-up building, a 1,900 SF office build out and a 1,200 SF outside storage canopy.

Gallery: Rainier Pallet



Rainier View Industrial Park - This 80,000+ SF office park is located in Auburn, Washington and consists of 3 tilt up

concrete warehouse buildings.  For a more detailed description of each of the 3 buildings, please click here.

Gallery: Rainier View Industrial Park






Roadway Express - A 7,350 SF addition was completed while the trucking facility remained in full operation.  Critical elements included tying onto an existing pre-engineered structure, addition of new truck/trailer aprons and a new fire sprinkler system throughout.

Wellington Hills Business Campus - Currently consists of 2 buildings, Building A and Building B in Woodinville, 

Washington.  Building A was designed and built for Primus Manufacturing and includes a total of 102,874 SF of

manufacturing and office space.  Building B was desigend and built to include 92,264 SF of manufacturing and office

space with an addtional 18,700 SF concrete mezzanine.

Gallery: Wellington Hills






Woodtone - A 40,000 SF wood processing facility located in Everett, Washington on a 6.8 acre site.  The main building

houses the office, showroom, and processing racks.  There are also 2 additional dry storage sheds on site.

Gallery: Woodtone